Currently we have two contactors on staff with a combined 36 years of experience.

Marcus Beaver - General contractor #912085
                                                           

James Graham - Electrical Contractor #916876                                                                 

                                           

 

Pictures of recently completed work:

 

Pictures of  house currently under construction.

 

These are of a floating wood floor we installed                       

 

 Windows and a sliding door that were removed and replaced

Fireplace mantle and masonry work 

  

A whole house of windows that were removed and replaced

These are pictures of a cabinet that we fabricated by hand.

 

In this condo we replaced the garage door, replaced the water heater and removed the recessed fluorescent lights and installed lighting.

As of 5/30/2008 we are halfway through a total remodel of a rental property. The job started on 5/17/2008. We completed the project on July 3, 2008.

 

Here we built a wheel chair ramp for the homeowner.

 

On this project we first enclosed an endless pool with a redwood deck and then built a patio cover.

 

Board on Board Redwood Fence we installed.

 

 This job consisted of closing in a screen room. Framing the walls. Installing windows. Sheet rocking the inside and stucco siding on the exterior.

 

We ripped out a small deck at an apartment complex, re-framed it, sheeted it, sealed it and then applied a concrete finish to make it last longer.

 

Our latest job to date. 1/30/2009 Two bathroom remodel.


 

We were hired to knock out an opening in a load bearing concrete wall and frame out the opening to be sheet rocked by the owner. As you can see from the cloudy pictures, it got pretty dusty in there.

 

 

 

Send mail to CompanyWebmaster with questions or comments about this web site.
Copyright © 2008 CompanyLongName
Last modified: 07/17/10